Estimating
Design Objectives
The
Estimating module
is an on-line
system for
estimating the cost
of a project.
It provides
a series of
analytical tools
for evaluating an
estimate through
five major
functional
facilities:
Estimating,
Bidding,
Scheduling,
Inflation/Escalation
Analysis, Risk
Analysis.
 |
Estimating
enables you to
arrive at the
total estimated
"cost"
for a project. |
 |
Bidding
enables you to
distribute
overhead costs,
apply profit,
and arrive at
the "bid
price" for
a project. |
 |
Scheduling
allows you to
define
schedules for a
project and
compute the
resource
demand, cash
flow analysis,
and return on
investment
analysis. |
 |
Inflation/Escalation
Analysis
enables you to
specify a
hierarchy of
inflation
indices that
can be applied
to the base
cost of the
estimate;
together with
the schedule,
these indices
compute the
anticipated
incremental
cost associated
with inflation.
Additionally,
you can define
an escalation
index, which
can be applied
to the bid
price, and the
payment
schedule to
compute the
anticipated
incremental
revenue
associated with
escalation. |
 | Risk
Analysis
provides a
method which
allows you to
enter
subjective
assessments on
the quality of
estimated costs
and quantities;
the system
quantifies
these analyses
and arrives at
a risk
evaluation of a
project's
estimated cost. |
Features
 |
Multiple
rate libraries
can be set up
for the
different
resources;
these may be
divided by
geographic area
or time period. |
 |
Group
libraries are
utilized to
define company
standard labor
crews,
equipment
spreads,
material
assemblies,
etc; these can
be accessed
through a
single code and
exploded into
their component
resources. |
 |
Historical
costs can be
stored either
as unit costs
or as
productivity
factors in the
libraries. |
 |
Flexible
account
structure
allows
user-defined
account
numbering and
summarization. |
 |
Multiple
estimating
methods include
the following
alternatives
that can be
used
simultaneously:
work
study analysis,
productivity,
unit price, and
lump sum. |
 |
Multi-currency
capability
highlights and
distributes a
project's
estimated cost
in each
currency.
A cost
type can have
up to nine rate
components.
Each
component can
have a separate
currency which
is converted to
the project
currency
utilizing a
user-defined
exchange rate. |
 |
Memo
item entry
enables you to
flag each line
in a cost item
as either
additive or
non-additive to
the total
project
estimate. This
permits, for
example, the
inclusion of
multiple
subcontractor
costs in
analysis
reports, while
adding only the
selected
subcontractor
quote to the
project's total
estimate. |
 |
Multiple
bid preparation
methods enable
you to allocate
estimated costs
to bid items
and apply your
profit margin
to arrive at a
final bid
price. This
allocation
procedure can
be performed at
any time during
the preparation
of the cost
estimate. |
 |
Cash
flow projection
is achieved
through the
entry of a
planned
construction
schedule; the
system
generates the
cost, revenue,
and resource
demand curves
for each
user-defined
period on a
cash or accrual
basis. |
 |
Inflation
computations
are available
through
utilization of
the planned
construction
schedule, and
user-defined
inflation
indices; the
system can
calculate the
anticipated
cost increment
for inflation
in each cost
item. |
 |
Risk
analysis
calculations
present the
probable ranges
of the
estimated
costs.
These
statistics are
achieved when
you combine
confidence
levels and
probable ranges
for resource
rates, quantity
of work to be
performed, and
production
rate. |
 | An
Estimating to
Cost Accounting
Interface Menu
enables you to
generate Cost
Accounting
"revenue",
"cost",
and
"production"
budgets. |
Module Interfaces
The
following System
20/20 module
receives ( Ü
) transactions from
the Estimating
module.
| Module |
|
Transactions
Sent and
Received |
|
Cost
Accounting
|
Ü
|
Revenue,
cost, and
production
budgets
|
Standard Reports
All standard reports provide multiple selection options.
|
Control
File Section
Listings
|
Cost
by Work
Operation
|
|
Work
Operation
Detail
|
Quantity
and Rate
Analysis
|
|
Project
Parameters
Summary/Detail
Reports
|
Bid
Project
Parameters
Detail
|
|
Project
Chart of
Accounts
|
Bid
Item
Summary/Detail
Reports
|
|
Project
Period
Analysis/Recap
Reports
|
Bid
Item Analysis
|
|
Resource
Rate
Summary/Detail
Reports
|
Bid
Item Schedule
Listing
|
|
Resource
Rate Cost
Item Summary
|
Bid
Total Cost
Analysis
|
|
Resource
Group
Summary/Detail
Reports
|
Schedule
Project
Parameters
|
|
Resource
Cost Analysis
|
Schedule
Project
Calendar
Listing
|
|
Resource
Schedule
Listing
|
Schedule
Bar Listing
|
|
Resource
Quantities by
Cost Item
Detail
|
Estimated
Revenue Over
Time
|
|
Resource
Quantities by
Cost Type
|
Investment
Analysis
|
|
Cost
Allocation
Listing
|
Inflation
Analysis
Reports
|
|
Cost
Allocation
Analysis
|
Escalation
Analysis
Summary/Detail
|
|
Cost
Item Summary
|
Risk
Analysis
Factors
Listing
|
|
Cost
Item Schedule
Listing
|
Cost
Item Level
Risk Analysis
|
|
Total
Cost Analysis
|
Operation
Level Risk
Analysis
|
|
|
|
|
|
|
|

|